Plazas decks inverted roofs green roofs and elevated decks.
Bituthane roof construction.
Apply bituthene 3000 membrane only in dry weather and when air and surface temperatures are 40 f 5 c or above.
For each of these applications and more there s a bituthene product developed by gcp applied technologies.
We are inspired to influence how the world is built.
Bituthene 4000 system combines a robust flexible pre formed membrane made of a high performance cross laminated hdpe carrier film with a tacky self adhesive rubberized asphalt compound and bituthene 4000 surface conditioner.
The bituthene waterproofing system is the most trusted post applied waterproofing membrane.
Bituthene deck system combines bituthene 4000 sheet membranes with bituthene deck prep to provide a durable waterproofing system capable of accepting a wide variety of wearing surfaces on above occupied space inverted roofs green roofs and elevated concrete decks.
Apply bituthene adhesive primer b2 lvc in dry weather above 25 f 4 c.
If the area around the substructure can be drained to a low level outlet then gcp recommends the hydroduct range of drainage membranes.
The bituthene system 4000 200 sq.
Bituthene 3000 is a high performance cold applied flexible preformed waterproof membrane combining a special high performance cross laminated hdpe carrier film with a unique self adhesive rubber bitumen compound.
It is supplied in easy to apply rolls which makes the self adhesive membrane a quick and clean install without the hazards associated with hot applied systems.
Flexible pre formed waterproof membrane with latex conditioner.
Bituthene 3000 is suitable for installation at temperatures of 40f and above.
Waterproof membrane and conditioner is a flexible pre formed membrane designed for foundation walls tunnels earth sheltered structures and more.
Plaza decks roof gardens.
Tunnels metro stations and infrastructure products.
Apply bituthene low temperature membrane only in dry weather and when air and surface temperatures are 25 f 4 c to 60 f 16 c.
We are dedicated to the development of high performance products the continued pursuit of advancement in construction technologies simplifying the complexities of construction worldwide and delivering value to our customers.
Concrete does need to be properly dried and primed before applying the bituthene.
Elevated or grade level podiums.
Protect bituthene membranes immediately after application to avoid damage from other trades construction materials or backfill using only protection 03 boards.